Electro-wind revolution
A life-changing experience for millions of people
through an innovative design of kinetic energy transformation.
Principle of electro-wind generation
Our electro-wind generation principle is based on the transformation of the wind's kinetic energy into electricity through an innovative patented wind turbine design.
The Mining-Energy Planning Unit issued a resolution in 2023 in which, after passing detailed engineering of our electro-wind model, it certifies registration in Phase 1 before the Colombian agency in charge of planning, reference and consultation in energy terms. An agency recognized nationally and internationally for its excellence and impartiality.
Development of customized projects
We take care of all the procedures and agreements necessary for the implementation of large-scale wind power projects, adapting to the specific needs of each site.
Land and Conditions Assessment
We carry out an exhaustive analysis of the site's eligibility for the installation of wind farms, considering geographical and climatic factors to ensure the efficiency and profitability of the project.
Installation
and permissions
We manage the entire installation process and obtaining the necessary licenses, ensuring compliance with all current regulations and standards.
Connection to the electrical grid
We are responsible for connecting wind farms to the electrical grid, ensuring the safe and efficient integration of the energy generated into the existing electrical system.
Implementation and monitoring
Once connected, we perform testing and tuning to ensure optimal operation, and provide ongoing monitoring to maximize infrastructure performance and durability.